Stanmore
This was a full strip-out and refurbishment of the entire property with a loft conversion and garden landscaping. Converting from a 3 bed, 2 bath house to a 4bed, 3 bath. The scope of works included;
- Full re-wire, electric underfloor heating throughout and sonos 1 speakers throughout the entire property
- Full central heating and water system with new mains water supply, megaflow, system boiler and all new pipework throughout.
- New kitchen
- 3 Bathrooms, fully tiled and fitted with walk-in shower trays and led feature lights
- Fitted wardrobes
- New carpets and fully tiled ground floor.
- Full loft conversion with posi-joists and steelwork to form a study/bedroom with ensuite bathroom. And plant room with the megaflow and boiler.
- First floor balcony off the master bedroom.

